| Available Materials | Aluminum, steel, stainless steel, brass, copper, iron, etc. |
| Surface treatment | All kinds of surface treatments are available, polishing, zinc plating, nickel plating, chrome plating, powder coating, and phosphate coating. |
| Processings | Laser Cutting, Precision Stamping, CNC Bending, CNC Milling, CNC Turning, Threading, Riveting, Drilling, CNC Punching, Die Casting, Laser Welding, etc. |
| Tolerance | +/-0.01mm, 100% QC quality inspection before delivery, can provide quality inspection form. |
| Drawing Accepted | IGS, STP, X_T, DXF, DWG, 3D, PDF |
| Sample Cost | Free of Sample Cost. Normally is USD 20-60 per Style Of Special Design. We Need Sample Charge, Can Refund when You Have Official Bulk Order. |
| Delivery Time | 1-25 days after order with prepayment based on products structure and quantity. |
Q Is your organization committed to the concept of total quality management?
Yes. No matter in laser cutting, bending, or CNC machining, the workers will conduct the first sample inspection and random inspection during the processing to ensure the quality of the products.
Q How many checks are performed on a project?
Usually, products will go through the following four inspections: incoming inspection, production first inspection, sampling inspection, and pre-shipment inspection. Among them, sampling inspection will be conducted multiple times.
Q Will you be able to work with our engineering team to review drawings and provide quick, estimated pricing for desired changes?
Yes, our engineers respond very quickly. If there is anything to be modified in the product, we can offer you a new price as soon as you tell us.
Q What kinds of information do you need for a quote?
Kindly please provide the product drawing in PDF, and it will be better if you can provide it in .dwg / .stp / .iges / .stl format.
Q What materials are available for custom fabrication?
We offer a wide selection of materials including aluminum, steel, stainless steel, brass, copper, and iron, to match your specific engineering requirements.
Q What is the typical lead time for production?
Delivery times range between 1 to 25 days after order prepayment. The exact schedule is calculated based on the complexity of the product structure and the final order quantity.